Base Surfaces
Recommended specification for seating skate park equipment
Both construction methods should allow for a 1 in 100 fall off to
assist with correct surface water drainage unless otherwise specified.
Tarmac
- Excavate area to a depth of 220mm
- Install concrete path edgings to perimeter
- Lay type one road stone base to a depth of 150mm (tolerance of
± 10mm)
- Lay asphalt base course to a depth of 45mm
- Lay asphalt smooth rolled wearing course to a depth of 20mm
- Maximum deviation of 3mm under a 3m straight edge
Concrete
- Excavate area to a depth of 250mm
- Lay type one road stone base to a depth of 125mm (tolerance of
± 10mm)
- Laser level concrete to PAV 2 specification with expansion joints
and floated smooth finish to a depth of 125mm
- Maximum deviation of 3mm under a 3m straight edge